Entries Filed
018
Cadence
Weekly
Active Since
April 2026
Words Written
~ 16k
18 entries · sorted newest first
2026 18 entries · year to date
Weekly Update — w/c 3rd August 2026

Fifty-seven items to Done and four to Won't Do, seven of them belonging to a week already written up and closed in the hours after the last entry was filed — the second week running that the tail after filing has not been empty. A client's domain moved hosts in under an hour on the Sunday afternoon, backup first and verification last. For the junior chess club the week's build was a game viewer: comments and variations, a static-position mode for the teaching pages, keyboard operability, lazy initialisation, and a no-JavaScript fallback that exists as authored because the site has no build step to generate one. A rule cited by seven tickets and reciprocated by none of them was made visible from its own ticket, by a sweep that had been built twice and lost twice before anyone committed it. Two more quality gates were caught reporting the wrong thing rather than nothing at all. A new engagement for a beauty therapy studio went from nothing to a nearly-finished site across two evenings. The trace identifier, the internal developer tool and the family-history foundations stood exactly where they were left.

Engineering~ 6 mins
Weekly Update — w/c 27th July 2026

Fifty-four items to Done — the largest week in this record — and five of them belong to a week already written up, closed in the half-hour after the last entry had been filed. For the junior chess club it was the build week proper: design tokens, a base layout and nine page templates in four days, with the palette's contrast measured against the AA thresholds before a single template was built on it. Then the gates built the week before were themselves audited, and four of the findings were about the checks rather than the site — a version pin that printed but never asserted, an accessibility gate that could not fail on six rules, a required check that gated the deploy but not the merge, and a viewport width nothing measured at all while the automated pass reported green. A second engagement went from signed-off specification to deployable site in a single evening. The retained veterinary practice turned a registration form into a waiting list, the e-commerce items raised a week earlier all closed, and the trace identifier, the internal developer tool and the family-history foundations stood exactly where they were left.

Engineering~ 6 mins
Weekly Update — w/c 20th July 2026

Paperwork first, then platform, then content — twenty-one items to Done, four of them landing on the Sunday evening after last week's entry had already been filed. The junior chess club engagement this journal could not describe a week ago now has both instruments executed: a services agreement and an Article 28 data-processing agreement, signed and returned before a line was built. Then the foundations went in — a private repository whose private status was verified rather than assumed, a static web app in an EU region confirmed in the portal rather than merely intended, and a nine-check consistency gate that notices the things a person eventually won't, including the location data photographs carry out of the camera. Two spikes settled a rendering question on real handsets and a licensing question before it could reach the deliverable. The retained veterinary practice's entries were cleared down again, three new e-commerce items opened on Sunday, and the trace identifier, the internal developer tool and the family-history foundations stood exactly where they were left.

Engineering~ 6 mins
Weekly Update — w/c 13th July 2026

The record, and the work that comes before the work. Seven items to Done and eight closed as Won't Do — a week that decided against rather more than it completed. The practice's own working notes for this site — its conventions, its amendment process, its redaction rules — were moved out of a machine-local store and into the repository, where they can be diffed and argued with like anything else; the check that prompted the move found them six versions out of date. A new unpaid engagement opened midweek and deliberately built nothing, its agreement not yet executed. The long-standing discount-code investigation was closed on the e-commerce side, the retained veterinary practice's form entries were cleared down again, and the internal developer tool, the trace identifier and the family-history foundations all stood exactly where they were left.

Maintenance~ 5 mins
Weekly Update — w/c 6th July 2026

The books, and the quiet work of subtraction. Fourteen items to Done across four projects, and not a new feature among them. The practice turned first to its own house — the year-end accounts and the VAT position analysed, the bookkeeping put on an automated footing; then outward, where an enterprise e-commerce order integration lost a layer of logic it had outgrown and gained an honest map of how a partner brand's orders and payments actually reach the finance system. The retained veterinary practice's site had an embedded third-party form taken out and a real booking route put in its place, and a September fee change published well ahead of the day it takes effect. A local dog-training club's handover was settled, and the internal developer tool stood exactly where last week left it.

Stewardship~ 7 mins
Weekly Update — w/c 29th June 2026

Proof, and the apparatus of publication. The internal developer tool took thirty of the week's thirty-six closed items — not new faculties this time but the two things that turn a working instrument into a releasable one: a full automated test suite that proves it behaves — unit, property-based, snapshot and component tests, with benchmarks and coverage — which paid for itself at once by surfacing two genuine faults; and the public scaffolding a tool needs before strangers can use it — reference documentation for each cron dialect it speaks, a cookbook of worked examples, and the privacy, security-disclosure and credits apparatus that lets it stand in the open. Alongside it, a family-history application's cloud foundations stayed in flight, and the smaller retained work was quietly kept.

Engineering~ 6 mins
Weekly Update — w/c 22nd June 2026

The inward tool, given its working faculties. The internal developer tool took twenty-one of the week's thirty-four closed items, carried from a face to an instrument that does its three jobs: a schedule you can type and read back in plain language, a calendar that shows the days it will actually fire — month, week and agenda, exportable to a real diary or spreadsheet — and a compare mode that sets two schedules side by side and marks the difference. Alongside it, a clinical canine massage practice's site gained its audit, telemetry and bot-protection layer ahead of launch, and the smaller retained work was quietly kept.

Engineering~ 6 mins
Weekly Update — w/c 15th June 2026

The inward week, continued — and the inward thing given a face. The new internal developer tool took thirteen of the week's eighteen closed items, carried from a working core to the surface a person actually touches: a visual design system and layout shell, working state held in a shareable link, and an end-to-end test harness wired into CI. Alongside it, a clinical canine massage practice's contact pipeline was proven and switched live, and the smaller retained work was quietly kept.

Engineering~ 5 mins
Weekly Update — w/c 8th June 2026

A week turned inward. A new internal developer tool — a cron-expression calculator, describer and comparer — took the bulk of it: thirty-two items, from an empty repository and CI pipeline through a complete domain layer and three cron parsers to a working set of services, while the enterprise e-commerce support carried on and the retained clients were quietly kept.

Engineering~ 6 mins
Weekly Update — w/c 1st June 2026

The mirror image of last week. The new clinical canine massage practice took the bulk of it — thirty-seven items, from signed paperwork through a scaffolded repository and provisioned cloud to a working, tested contact pipeline — while the internal platform's modelling advanced and the retained clients were quietly kept.

Engineering~ 6 mins
Weekly Update — w/c 25th May 2026

A building week, and mostly out of sight. The internal quantitative sports-analytics platform took the bulk of it — twenty-six items, from data ingestion through modelling to a working execution service — while a new client engagement's foundations were laid and the retained clients quietly tended.

Engineering~ 6 mins
Weekly Update — w/c 18th May 2026

Closing week. The company-website infrastructure programme reached its formal end — DNS authority returned to GoDaddy, legacy hosting cancelled, observation closed — while a new local-client engagement began the right way, with foundations before code.

Stewardship~ 5 mins
Weekly Update — w/c 11th May 2026

The week after. Phase 7 closed as an epic, telemetry sharpened, uptime watched from the outside, mirrors and archives put in place — and an enterprise e-commerce go-live entered its post-cutover hyper-care phase.

Stewardship~ 5 mins
Weekly Update — w/c 4th May 2026

Launch week. Two production go-lives in seven days — the new company website went live at thecodeabides.co.uk, and an enterprise e-commerce platform reached its own cutover milestone alongside.

Cloud & DevOps~ 6 mins
Weekly Update — w/c 27th April 2026

Two long-running engineering arcs converging in the same seven days — a new company website on Azure built feature-complete, and an enterprise e-commerce client cutover commenced. Forty-nine items to Done across three projects.

Engineering~ 6 mins
Weekly Update — w/c 20th April 2026

A quieter week, by design. The headline activity was unglamorous and important — a comprehensive npm package upgrade sweep across five Node.js microservices, kept on cadence as a matter of supply-chain hygiene.

Maintenance~ 4 mins
Weekly Update — w/c 13th April 2026

Five active projects, including the kick-off of a new internal initiative — a quantitative sports analytics platform moved from idea to scaffolded codebase, with progress alongside on greenfield development, enterprise e-commerce, and client IT.

Engineering~ 5 mins
Weekly Update — w/c 7th April 2026

A founding week. The full application scaffold for a bespoke web platform came together on a .NET 10 / C# 14 stack with Onion Architecture across five projects, and the CI pipeline that will carry the work was wired up alongside.

Engineering~ 4 mins

End of record · The journal begins here